New flooring installed with careful preparation for a clean, finished result. We work with your remodeling plans to create smooth transitions and a finished look throughout your home.
Open 24/7 across Memphis · Flat-rate pricing quoted before we start
Overview
Installing new flooring involves more than placing material across an open room. The existing floor must be checked for uneven areas, damage, moisture concerns, and changes in height between connected spaces. Those conditions affect the preparation, layout, and finished result.
Rated Renovations approaches floor installation as part of the larger remodeling scope. We plan the direction of the flooring, account for doorways and transitions, and prepare the surface before installation so the finished floor fits the room and works with the surrounding spaces.
Symptoms
When to call
Worn or damaged floors
Deep scratches, loose sections, stains, and visible wear can make a room feel unfinished. When the existing flooring has reached the point where repairs will not produce a consistent surface, replacement may be the more practical remodeling choice.
Uneven surfaces
Soft spots, dips, raised areas, and movement underfoot can affect the flooring installed above them. Identifying those conditions before installation helps determine what preparation is needed instead of hiding a problem beneath the new floor.
Changing the room's layout
A remodel can leave you with different cabinets, walls, doorways, or connected rooms. New flooring gives the layout a continuous finish, but the direction, starting point, and transition locations should be decided before material is installed.
Replacing mismatched flooring
Different flooring from room to room can make connected spaces feel divided. Installing one coordinated floor, or using deliberate transitions where materials change, can make the remodeled area feel more complete.
Our process
How the installation goes
1
Review the space
We look at the rooms involved, the existing floor, door clearances, adjoining surfaces, and the locations where the new flooring will end. This establishes the scope before preparation and installation begin.
2
Prepare the surface
The existing flooring is removed when required, and the surface is checked for damage, uneven areas, and other conditions that could affect installation. Necessary preparation is completed before the new material is placed.
3
Plan the layout
The flooring direction, starting point, pattern, cuts, and transition locations are considered before installation. Planning these details helps keep the finished lines consistent through rooms, openings, and visible edges.
4
Install and finish
The selected flooring is installed across the prepared surface, then the edges, doorways, base areas, and transitions are finished. The work is checked for fit, movement, visible gaps, and a clean connection to adjacent flooring.
Scope
What the job includes
Floor installation is quoted from the measured area, selected flooring, removal needs, subfloor condition, layout, and finishing details. Preparation and transition work are included in the scope when they are identified during the review.
The total depends on the area being covered, the selected flooring, removal of the existing floor, surface preparation, and the number of transitions or detailed cuts. The work is quoted after the space and installation conditions are reviewed.
Can new flooring be installed over the existing floor?
Sometimes, but it depends on the existing material, its condition, the height of adjoining floors, and the installation requirements of the new flooring. Removing the old floor may be necessary when it is damaged, loose, uneven, or likely to affect the finished result.
How do you keep flooring level between rooms?
The floor heights are reviewed before installation, including the existing surface and the new material. Preparation can address some differences, while other changes may require a transition at the doorway or where the flooring changes.
How long does floor installation take?
The schedule depends on the size of the area, removal work, surface preparation, the flooring selected, and the number of rooms involved. The expected sequence is discussed after the space is reviewed so preparation and installation are accounted for.