Remodeling

Plumbing

Plumbing services for repairs, replacements, and remodeling projects. From fixture updates to plumbing adjustments, we handle the work needed to keep your project moving forward.

Open 24/7 across Memphis · Flat-rate pricing quoted before we start

A home remodeling contractor working on a residential plumbing job — mid-task, hands, tools and the work itself in sharp focus, the rest of the space softly out of focus

Overview

A plumbing problem is not always visible at the fixture. Slow drainage, damp cabinets, inconsistent water flow, and stains around supply lines can point to an issue behind the finished surface. Finding the source before making repairs helps prevent the same problem from returning.

During a remodeling project, plumbing locations affect the layout, cabinet plan, flooring, and wall finishes. Supply lines, drains, shutoffs, and fixture connections should be planned together so the finished space works as intended and remains accessible where future service may be needed.

Symptoms

When to call

A leaking fixture or pipe

Water around a faucet, toilet, valve, or cabinet should not be treated as a minor inconvenience. Even a small leak can affect nearby surfaces, so the source needs to be identified before damaged materials are replaced.

Slow or backed-up drainage

A sink, tub, or shower that drains slowly may have a blockage or a drainage problem farther along the line. Repeated backups are a reason to investigate the pipework rather than relying on short-term treatments.

A remodeling layout change

Moving a sink, toilet, shower, or appliance changes both the supply and drainage runs. Plumbing should be reviewed while the walls and floor are accessible, before cabinets, tile, and other finishes make the work more difficult.

An aging or damaged connection

Corrosion, loose connections, worn shutoffs, and damaged supply lines can make a fixture unreliable. Replacing the affected parts during a larger renovation can address the problem while the surrounding area is already open.

Our process

How the work goes

  1. Review the problem or layout

    The existing fixtures, visible connections, drainage, and proposed layout are reviewed first. The goal is to understand what needs repair, what needs replacement, and whether the planned plumbing fits the remodeled space.

  2. Plan the pipework

    Supply lines, drains, shutoffs, fixture locations, and access points are mapped before installation begins. This is also when conflicts with cabinets, walls, flooring, and other remodeling work can be identified.

  3. Complete the plumbing work

    The required repairs, replacements, or new connections are completed while the relevant areas are accessible. Existing materials that are not part of the scope remain separate from the new work.

  4. Check connections and fixtures

    Connections and fixtures are checked for leaks, drainage problems, and proper operation before surrounding surfaces are closed or finished. Any needed adjustments are addressed while access is still available.

Scope

What the job includes

Quoted from the observed plumbing conditions and the defined remodeling scope, with repairs, replacement parts, and finish access identified separately.

Request service
  • Fixture connections
  • Supply line work
  • Drainage work
  • Shutoff replacement
  • Remodeling layout changes

Plumbing questions

Answers before you book.

More questions on our full FAQ page.

Can plumbing be moved during a remodel?

Yes, plumbing locations can be changed when the new supply and drainage routes are planned with the room layout. The available access, existing pipework, fixture locations, and surrounding finishes all affect the work.

Should plumbing be completed before cabinets and tile?

Plumbing that runs inside walls, floors, or cabinets should be completed before those areas are closed or finished. Fixture connections may happen later, but the hidden pipework needs to be planned and checked first.

Why does a drain keep backing up?

A recurring backup may come from a blockage, a damaged section, or a drainage layout issue. The cause should be identified before the drain is covered by new flooring, cabinets, or other remodeling finishes.

What should be included in a plumbing quote?

The quote should describe the plumbing work, fixture locations, replacement parts, access needed, and any related remodeling surfaces that must be opened or restored. Separating those items makes the scope easier to review.

A remodeling plan should
not become a moving target.

Tell us what you want to change, which part of the home is involved and what you want the finished space to do.

Start your remodeling project.

  • Licensed & Insured
  • Same-Day Service
  • 24/7 Emergency Support
  • Satisfaction Guaranteed
Call us now Book online